Power utility EDF has begun a major overhaul of the Sizewell B nuclear power station in southeast England with work set to cost £75m (€65m, $71m) and take around two months. During the outage teams at Sizewell B – which is due to close in 2035, but could operate until 2055 – will carry out work that includes replacing a high-pressure rotor and three low pressure rotors in one of the station’s turbine generators and replacing about a third of … read more »
The post Sizewell B appeared first on No2NuclearPower.