Bulky building materials for Sizewell C are set to be stored over 15 acres at two Suffolk ports as the project prepares for the start of construction. One 15-acre storage site will be at the Port of Ipswich and the other two totalling 15 acres at the Port of Lowestoft and are part of plans to move the majority of the construction materials that will be required to build the nuclear power station at Leiston via sea and rail. Sizewell … read more »
The post Sizewell appeared first on No2NuclearPower.