We recently shared the news that we have awarded our Southern Trench Interim Membrane (STIM) contract to Graham Construction Ltd (GRAHAM), who will be responsible for placing a membrane – or protective layer – over the legacy disposal trenches over the next four years.
NWS 22nd Oct 2024 read more »
The post Low Level Waste Repository appeared first on No2NuclearPower.