Engineering teams have successfully lifted the third and final steel liner ring into place at Hinkley Point C’s second unit using the giant crane known as Big Carl. Engineering teams have lifted the 423-tonne third and final steel liner ring into place at unit 2 of the Hinkley Point C NPP using giant crane, Big Carl. The steel ring, which is 11.6 metres in height and 47 metres in diameter, forms part of the inner containment wall of the reactor … read more »
The post Hinkley appeared first on No2NuclearPower.