BGEN has been awarded a £84-million contract by GE Steam Power Systems to provide electrical and instrumentation solutions for the project. Steam Power will provide the two conventional power islands for Hinkley, which includes the Arabelle steam turbine, generator and other critical equipment. The Arabelle produces 2% more power output than a traditional configuration, has a 99.96% reliability rate and will be one of the biggest ever to be built. Each turbine will br capable of producing 1 770 MW … read more »
The post Hinkley appeared first on No2NuclearPower.