Letter Katy Attwater: It is a bit of a stretch for EDF to describe the installation of connections between the four cooling water intake heads and the two x 3.5 km cooling tunnels below the sea bed, as the final stage of work as described in the Press. EDF are prone to exaggeration as proven be their missed deadlines and massive overruns on costs. Apart from a battle with local objectors and the Environment Agency over EDFs refusal to install … read more »
The post Hinkley appeared first on No2NuclearPower.